Home  > Manufacturers > Warbirds Decals > Decals and Surface Detailing > B-17G Little Patches

B-17G Little Patches
Waterslide Decals (includes decals only).

 Other products to consider: (10)

B-17f General Stenciling and Walkway Lines
Warbirds Decals
$19.95 $14.99
B-17f/g Sally-B, Memphis Belle
Warbirds Decals
$19.95 $14.99
B-17g Little Miss Mischief
Warbirds Decals
$19.95 $14.99
 Applicable Products:

US B-24J Liberator
HobbyBoss Models
$239.95 $179.99
US B-24D Liberator
HobbyBoss Models
$229.99 $169.99
Select a thumbnail to see the picture full-size.
In Stock (Ships in 1-3 business days)List price: $19.95
You pay: $14.99
(All prices in U.S. Dollars)Add to cart
Add to watch list

Manufacturer: Warbirds Decals
Stock Number: WBS 132080
Scale: 1/32
View all products of type "B-17 Fortress"
View all products of type "B-24 Liberator"
B-17G-25-BO 42-36178 'Little Patches' 324th & 401st BS 91BG

Artist Tony Starcer's original pin-up was a blonde wearing an Air Force cap (depicted here). His artwork was probably based on an illustration by Gil Elvgren.

Links from one product to another on the Scale Hobbyist site should not be construed as a recommendation or guarantee of compatibility. Scale Hobbyist makes no claim as to and is not responsible for the fitment, suitability or applicability of any specific product in relation to any other. Please carefully research any product you plan to purchase to combine with another kit. Variant parts and decal sets may require some modification to enable them to fit properly with their intended third party kits, and are intended for advanced modelers.







We accept paypal, as well as mastercard, visa, american express and discover cards. We ship via UPS and US Postal Service.

Copyright © 2005-2025 Scale Hobbyist, all rights reserved